2026-03-08
Drop the social-feed feature from MVP
Cutting the social feed bought us the four weeks we needed for the booking flow. The right cut, against the team's initial instincts.
A pet-care coordination project — final-year university work.
Submitted and graded. The project page exists as an archive of what was built and what I learned about coordinating a four-person student team under deadline.
2026-03-08
Cutting the social feed bought us the four weeks we needed for the booking flow. The right cut, against the team's initial instincts.
2026-02-12
A single database with schemas per concern was the right call for a four-person, twelve-week project. We would have lost the time reconciling event streams.